Queens Kew Gardens Hills
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 4-06704-0001), so they can include other buildings on the same lot.
1723 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Mar 19, 2025 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT EAST WALL AT PUBLIC HALL, 3rd STORY |
| Mar 19, 2025 | B | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE AT PUBLIC HALL, 1st STORY |
| Mar 18, 2025 | B | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT EXIT DOOR AT WEST WALL LEADING TO SOUTH YARD AT PUBLIC HALL, 1st STORY |
| Mar 18, 2025 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT EXIT DOOR AT WEST WALL LEADING TO SOUTH YARD AT PUBLIC HALL, 1st STORY |
| Mar 18, 2025 | B | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK SET AT FIRE DOOR AT SOUTH WALL LEADING TO APT 1B AT PUBLIC HALL, 1st STORY |
| Mar 18, 2025 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT FIRE DOOR AT SOUTH WALL LEADING TO APT 1B AT PUBLIC HALL, 1st STORY |
| Mar 18, 2025 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR AT EAST WALL LEADING TO APT 1B AT PUBLIC HALL, 1st STORY |
| Mar 18, 2025 | C | VIOLATION DISMISSED | Not available | §27-2005 (E) HMC: PROVIDE WRITTEN NOTICE TO THE TENANTS AT LEAST TWENTY-FOUR HOURS PRIOR TO ESSENTIAL SERVICE INTERRUPTION BY POSTING A NOTICE IN A PROMINENT PLACE WITHIN THE PUBLIC PART OF THE BUILDING AND ON EACH FLOOR OF SUCH BUILDING, WHERE AN OWNER MUST MAKE A REPAIR THAT MAY RESULT IN AN INTERRUPTION OF ESSENTIAL SERVICES SUCH AS UTILITIES(HEAT, HOT WATER, GAS, ELECTRICITY, OR ELEVATOR) THAT IS EXPECTED TO CONTINUE FOR MORE THAN TWO HOURS. SAMPLE NOTICE AVAILABLE AT WWW.NYC.GOV/HPD OR AS PROVIDED IN THIS NOTICE OF VIOLATION. MISSING AT PUBLIC HALL, 1st STORY |
| Mar 18, 2025 | B | VIOLATION CLOSED | 2G | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Mar 18, 2025 | B | VIOLATION CLOSED | 2G | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Mar 18, 2025 | C | VIOLATION DISMISSED | 2G | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Mar 18, 2025 | C | VIOLATION DISMISSED | 2G | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Mar 18, 2025 | C | VIOLATION DISMISSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED AT ENTRANCE TO CELLAR AT BOILER ROOM |
| Mar 18, 2025 | C | VIOLATION CLOSED | 3F | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Mar 18, 2025 | C | VIOLATION DISMISSED | 3F | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Mar 18, 2025 | C | VIOLATION DISMISSED | 3F | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Mar 18, 2025 | C | VIOLATION DISMISSED | Not available | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ALL STORY AT PUBLIC HALL |
| Mar 13, 2025 | B | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT BUILDING FRONT ENTRANCE DOOR AT PUBLIC HALL, 1st STORY |
| Mar 13, 2025 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BUILDING FRONT ENTRANCE DOOR AT PUBLIC HALL, 1st STORY |
| Mar 13, 2025 | C | VIOLATION CLOSED | 2G | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES TO GAS RANGE IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 13, 2025 | B | VIOLATION CLOSED | 2G | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WINDOW SASH SPRING BALANCE AT SOUTH WALL. IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 13, 2025 | B | NOT COMPLIED WITH | 2G | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERATIVE BELL, RETURN BUZZER & INTERCOM SYSTEM IN THE FOYER LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 5, 2025 | A | NOT COMPLIED WITH | 1F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 5, 2025 | A | NOT COMPLIED WITH | 1F | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM FROM BUILDING ENTRANCE TO EAST WALL IN THE FOYER LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Feb 13, 2025 | A | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 2H | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 13, 2025 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 2H | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 13, 2025 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 2H | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 13, 2025 | C | VIOLATION CLOSED | 2H | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 13, 2025 | A | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 2H | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 29, 2025 | B | VIOLATION CLOSED | 3B | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B , 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 29, 2025 | B | VIOLATION CLOSED | 3B | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B , 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 23, 2025 | B | NOT COMPLIED WITH | 1F | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jan 23, 2025 | B | NOT COMPLIED WITH | 1F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jan 23, 2025 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT CELLAR STORY |
| Jan 23, 2025 | C | VIOLATION CLOSED | 1F | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 3rd ROOM FROM EAST LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jan 13, 2025 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM |
| Jan 13, 2025 | B | NOT COMPLIED WITH | 1F | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 13, 2025 | C | VIOLATION CLOSED | 1F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 13, 2025 | C | VIOLATION CLOSED | 1F | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 3, 2025 | B | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH ASSEMBLY AT FIRE DOOR 75-05 150ST AT PUBLIC HALL, 1st STORY |
| Jan 3, 2025 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FIRE DOOR LATCH, AT 75-05 150 ST AT PUBLIC HALL, 1st STORY |
| Dec 10, 2024 | B | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH ASSEMBLY AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY |
| Dec 10, 2024 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH ASSEMBLY AND HINGES AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY |
| Dec 6, 2024 | C | VIOLATION CLOSED | 1F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR UNKEYED PLASTER AT CEILING IN THE KITCHEN LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Dec 6, 2024 | C | VIOLATION CLOSED | 1F | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Dec 6, 2024 | C | VIOLATION CLOSED | 1F | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Dec 6, 2024 | C | VIOLATION CLOSED | 1F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Dec 6, 2024 | C | VIOLATION CLOSED | 1F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Dec 6, 2024 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT PUBLIC HALL |
| Dec 6, 2024 | C | VIOLATION DISMISSED | 1F | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |