NYC Building Report

Manhattan East Harlem (North)

58 East 117 Street, Manhattan

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 1-01622-0043), so they can include other buildings on the same lot.

542 records

Date Class Status Apartment Summary
Mar 4, 2025 A FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Mar 4, 2025 A FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Mar 4, 2025 C FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Mar 4, 2025 C VIOLATION CLOSED 3G HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
Mar 4, 2025 C VIOLATION DISMISSED 6F § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE PAINTED SPRINKLER HEAD AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6F, 5th STORY, 4th APARTMENT FROM WEST AT NORTH
Mar 4, 2025 B VIOLATION DISMISSED 5E § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Mar 4, 2025 B VIOLATION DISMISSED 3A § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
Mar 4, 2025 C VIOLATION DISMISSED 1A § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE PAINTED SPRINKLER HEAD AT CEILING IN THE FOYER LOCATED AT APT 1A, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
Jan 19, 2025 C VIOLATION CLOSED 5D § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HYDRONIC BASEBOARD HEATER MISSING COVER IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Jan 19, 2025 C VIOLATION CLOSED 5D § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Jan 19, 2025 B VIOLATION DISMISSED 5D § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT SWITCH AT EAST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Jan 19, 2025 C VIOLATION CLOSED Not available § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR TO BOILER ROOM LOCKED AT BASEMENT
Jan 19, 2025 B VIOLATION DISMISSED 5D § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT BATHTUB WASTE LINE IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Jan 19, 2025 C VIOLATION WILL BE REINSPECTED 5D § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HYDRONIC BASEBOARD HEATER MISSING COVER IN THE 5th ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Jan 5, 2025 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Jan 5, 2025 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Jan 5, 2025 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Jan 5, 2025 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Dec 22, 2024 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ABOVE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Dec 22, 2024 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Dec 22, 2024 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Dec 22, 2024 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Dec 22, 2024 C FIRST NO ACCESS TO RE- INSPECT VIOLATION 6G HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Dec 19, 2024 B VIOLATION CLOSED 3A § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
Dec 19, 2024 A VIOLATION CLOSED 3A § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
Dec 19, 2024 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 3A § 27-2005 HMC: REFIT UPPER AND LOWER WINDOW SASHES AT EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
Dec 19, 2024 B VIOLATION CLOSED 3A § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH AND NORTH WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
Dec 19, 2024 B VIOLATION CLOSED 3A § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
Dec 18, 2024 B VIOLATION CLOSED 6F § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6F, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
Dec 18, 2024 B VIOLATION CLOSED 6F § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6F, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
Dec 18, 2024 C VIOLATION CLOSED 6F § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6F, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
Dec 11, 2024 A VIOLATION CLOSED 2I § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET AT CEILING IN THE BATHROOM LOCATED AT APT 2I, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Dec 11, 2024 C VIOLATION CLOSED 2I HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2I, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Dec 4, 2024 C VIOLATION CLOSED 4G HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Nov 30, 2024 B VIOLATION CLOSED 5E § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATH TUB IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Nov 30, 2024 B VIOLATION CLOSED 5E § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES KITCHEN SINK IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Nov 30, 2024 B VIOLATION CLOSED 5E § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES KITCHEN SINK IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Nov 30, 2024 B VIOLATION CLOSED 5E § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Nov 30, 2024 C VIOLATION DISMISSED 5E § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Nov 30, 2024 B VIOLATION CLOSED 5E § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Nov 30, 2024 B VIOLATION CLOSED 5E § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Nov 15, 2024 C VIOLATION CLOSED 3D HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Nov 15, 2024 B VIOLATION CLOSED 3D § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Nov 15, 2024 B VIOLATION CLOSED 3D § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Sep 29, 2024 C VIOLATION CLOSED 5G § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Sep 29, 2024 B VIOLATION CLOSED 5G § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 6th ROOM FROM NORTH LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Sep 29, 2024 B VIOLATION CLOSED 5G § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Sep 29, 2024 B VIOLATION CLOSED 5G § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT AT NORTH WALL IN THE KITCHEN LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Sep 29, 2024 B VIOLATION CLOSED 5G § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Aug 13, 2024 B VIOLATION CLOSED 5G § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH