Brooklyn Crown Heights (North)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-01178-0021), so they can include other buildings on the same lot.
310 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Jun 11, 2020 | B | NOT COMPLIED WITH | 2B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND AT SOUTH WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, APARTMENT AT NORTH |
| Jun 11, 2020 | B | NOT COMPLIED WITH | 2B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND AT SOUTH WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, APARTMENT AT NORTH |
| Jun 11, 2020 | A | VIOLATION CLOSED | 2B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 1 SQ.FT. AT CEILING AND 1 SQ.FT. AT SOUTH WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, APARTMENT AT NORTH |
| Jun 11, 2020 | B | NOT COMPLIED WITH | 2B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, APARTMENT AT NORTH |
| Jun 11, 2020 | B | NOT COMPLIED WITH | 2B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, APARTMENT AT NORTH |
| Feb 26, 2020 | A | VIOLATION CLOSED | Not available | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED |
| Feb 26, 2020 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK SET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY |
| Feb 26, 2020 | B | VIOLATION CLOSED | 2B | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 26, 2020 | A | VIOLATION CLOSED | 2B | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE 553 CERAMIC TILES WITH GROUTED JOINTS OF VISIBLE MOLD AT NORTH ,SOUTH AND WEST WALLS IN THE BATHROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 26, 2020 | A | NOT COMPLIED WITH | 2B | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES WITH GROUTED JOINTS OF VISIBLE MOLD AT EAST AND NORTH WALLS IN THE BATHROOM FROM EAST AT SOUTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 23, 2020 | A | NOT COMPLIED WITH | Not available | § 27-2048 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS AT 2ND AND 4TH STORIES AT PUBLIC HALL |
| Jan 23, 2020 | C | VIOLATION DISMISSED | 2B | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 2B, 2nd STORY, APARTMENT AT NORTH |
| Jan 4, 2020 | A | VIOLATION CLOSED | 4B | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM , THE 1st BATHROOM , THE KITCHEN , THE 2nd PRIVATE HALLWAY , THE 1st PRIVATE HALLWAY , THE FOYER , THE 1st ROOM FROM EAST, THE 2nd ROOM FROM EAST, THE 3rd ROOM FROM EAST, THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, 3rd WINDOW FRAME FROM WEST AT NORTH WALL, WEST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE NORTH WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE 1st WINDOW FRAME FROM WEST AT NORTH WALL, EAST WALL, SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 1st BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE FOYER LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, WEST WALL IN THE 2nd PRIVATE HALLWAY LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st PRIVATE HALLWAY LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, 1st WINDOW FRAME FROM WEST AT NORTH WALL, 2nd WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | C | VIOLATION CLOSED | 4B | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 1; IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | C | VIOLATION CLOSED | 4B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 4, 2020 | B | VIOLATION CLOSED | 4B | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATH TUB IN THE 2nd BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Nov 22, 2019 | B | NOV SENT OUT | 4A | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK AT DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 22, 2019 | B | NOV SENT OUT | 4A | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 22, 2019 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS AT PUBLIC HALL BULKHEAD |
| Nov 22, 2019 | B | NOV SENT OUT | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING, EAST AND SOUTH WALLS AT PUBLIC HALL BULKHEAD |
| Nov 22, 2019 | B | NOV SENT OUT | Not available | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL BULKHEAD |
| Nov 22, 2019 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 4th STORY |
| Nov 22, 2019 | B | NOV SENT OUT | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 4th STORY |
| Nov 22, 2019 | B | NOV SENT OUT | Not available | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 4th STORY |
| Nov 22, 2019 | B | NOV SENT OUT | 4A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 22, 2019 | B | NOV SENT OUT | 4A | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... THE WEST WINDOWFRAME, TOTAL 6 SQ FT IN THE 2nd BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 13004859 ISSUED 08-APR-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL, TOTAL 3 SQ FT IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 13004855 ISSUED 08-APR-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 2nd BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 8, 2019 | A | VIOLATION CLOSED | 2B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... THE WEST WINDOWFRAME, TOTAL 6 SQ FT IN THE 2nd BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 8, 2019 | A | VIOLATION CLOSED | 2B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL, TOTAL 3 SQ FT IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Apr 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 22, 2019 | C | VIOLATION CLOSED | 2B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOTWATER EXCEEDING THE MAXIMUM ALLOWABLE TEMPERATURE 0F 130 DEGREES . (FOUND144) IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |