Bronx Belmont
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 26, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN PARKING LOT AND RETAINING WALL IN SAFE CONDITION.T HE ONE STORY CELLAR AT 668 CRESCENT AVE,RETAINING WALL CONSISTS OF RUB BLE MASONRY TOPPED WITH CMU.THE PARKING LOT GRADE WAS PREVIOUSLY RAISE D WITHOUT REQUIRED PERMITS IMPOSING ADDITIONAL SURCHARGE LOADS THAT DA MAGED THE EXISTING RW.REMEDY:OWNER TO RETAIN NYSPE TO EVALUATE & FILE |
| Jun 16, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER ORDER 051325RW20604BH CONTROL#3657 70 ISSUED MAY 13,2025.UP TO TODAY'S DATE,NO PERMITS HAVE BEEN OBTAINED TO REPAIR STRUCTURALLY COMPROMISED RETAINING WALL.REMEDY:IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 051325RW20604BH ISSUED ON MAY 13,2025 |
| May 14, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMMISSIONERS ORDER CONDITION 033125CRW20602BH ISSUED ON MARCH 31, 2025. UP TO TODAY'S DATE, NO PERMITS HAVE BEEN OBTAINED TO REPAIR STRUCTURALLY COMPROMISED RW REMEDY:IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 033125CRW20602BH ISSUED ON MARCH 31, 2025 |
| May 13, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN RETAINING WALL IN SAFE CONDITION. PROPERTY IS STRUCTURALLY COMPROMISED AND POSES A DANGER TO THE PUBLIC. REMEDY: IMMEDIATELY RETAIN A LICENSED ENGINEER & ENDORSED CONTRACTOR TO PROVIDE DRAWINGS OF THE RW REPAIRS BY JUNE 27, 2025.OBTAIN PERMITS FOR REPAIRS & COMMENCE CONSTRUCTION BY JUNE 9, 2025 |
| Mar 31, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK/DEMOLITION RETAINING WALL EXP#4, HAS PARTIALLY COLLAPSE DUE TO NON-CODE COMPLIANT REFILLING ABOVE RETAINING WALL. RW HAS RENTERED THE EMERG EGRESS PATHWAY OF ADJOINED BLDG UNSTABLE & MAY COLLAPSE ANY TIME. REMEDY:IMMEDIATE RETAIN LIC. ENGINEER TO PROCEED W/ EMERGENCY DEMO/STABILIZ/REBUILT DEPT OF BLDGS,280 BWY,BILL HALIADAKIS |